Recon

RECON BATHROOMs

BATHROOM PODS​

BATHROOM PODS

RECON MODUL provides solutions by producing complete fully-equipped bathroom pods units according to the project layouts and individual designs for B2B clients throughout Europe and beyond.

On-site built bathrooms can take from 6 to 12 weeks to complete requiring multiple trades and extensive site management. Most of the time, from 6 to 8 Recon Modul steel-framed bathroom pods can be offloaded on-site in two hours for quick installation.

Moreover, site-based bathroom construction requires different trades and up to 17 additional operations and additional drying time. With Recon Modul, this process is reduced to a single supplier, which means less risk of delays and simplified procurement.

By moving bathroom construction into a controlled factory environment can be saved approximately 20 weeks on a large residential project. It means a faster return on investment for the developer, less risk for the contractor, earlier occupation for the client. 

WHAT WE DO

RECON MODUL provides solutions by producing complete fully-equipped bathroom pods units according to the project layouts and individual designs for B2B clients throughout Europe and beyond.

Designing

The creation process of bathroom modules is based on innovative technologies.

Manufacturing

Durable steel framing constructions built-in the off-site factory according to ISO regulations and OHSAS management system.

Delivering

Recon Modul delivers completed prefabricated bathrooms always on time and properly secured.

WHY CHOOSE US

THE CONSTRUCTION TIME CAN BE REDUCED UP TO 50 TIMES

ALL TESTS OF UTILITY SYSTEMS ARE PERFORMED

Project freedom

Reduction of costs 

CONSTANT QUALITY CONTROL

eco-friendly construction 

QUICK AND EASY INSTALLATION

WEATHER CONDITIONS DO NOT IMPACT ON MANUFACTURING PROCESS

We are one and only partner for all construction ASPECTS

PROCESS

SALES

Our partnership starts with the business consultation. Each project needs to be in accordance with the schedule. This is why it is important to have good understanding and awareness of the entire process on both sides of the contract.

DESIGN

At this stage you will be in touch with our designers to incorporate client's own unique requirements or select from pre-existing, validated technical solutions.

MOCK-UP

The mock-up stage is very important because it turns project to reality. There is an opportunity to see your project in many different ways. Most importantly, this is assurance for both parties that we are on the same path.

PRODUCTION

The 4th stage is in accordance with the required bathroom pods and delivery dates. Production processes are completed off-site in our factory in accordance to the high quality standards.

DELIVERY

Our business is all about following timeframes. We transport pods to a requested location. We guarantee prompt delivery and installation on-site.

Are you looking for prefabricated pods manufacturer for your next project?

RECENT PROJECTS

Mārpagalmi – YIT

Zemaišu iela 3, Riga, Latvia

 116 apartments

Hilton Garden Inn – Eika

Gedimino av. 44B, Vilnius, Lithuania

164 rooms

Jauna Teika – Hanner

Ropažu iela 14, Riga, Latvia

390 apartments

V26 –  Hanner

Vesetas iela 26, Riga, Latvia

102 apartments

Lindenholma – Vastint

Maldugunu iela 6, Marupe, Latvia

116 apartments

Naujasis Skansenas – YIT

Linkmenų str. 15, Vilnius, Lithuania

83 apartments

Mārpagalmi II – YIT

Zemaišu iela 3, Riga, Latvia

39 apartments

Optimized with PageSpeed Ninja